| Quantidade mínima: | 1 |
| preço: | Negociável |
| Período de entrega: | 7 a 10 dias úteis |
| Método de pagamento: | T/T |
| Capacidade de fornecimento: | 5000 unidades por ano |
1. Flat rack is better for bigger construction equipmennt and no need to dismantle.
2.Container is cheapest and fast.
3.Bulk cargo ship is better for bigger construction equipment.
4. Ro-Ro ship is faster and good for every kinds machine
| Quantidade mínima: | 1 |
| preço: | Negociável |
| Período de entrega: | 7 a 10 dias úteis |
| Método de pagamento: | T/T |
| Capacidade de fornecimento: | 5000 unidades por ano |
1. Flat rack is better for bigger construction equipmennt and no need to dismantle.
2.Container is cheapest and fast.
3.Bulk cargo ship is better for bigger construction equipment.
4. Ro-Ro ship is faster and good for every kinds machine